2018
IRRAWADY RIVER, MYANMAR
Contract awarded for the supply of Led Marine Lanterns as well as Monitoring and tracking system for buoys on the Irrawaddy River Myanmar.
2018
IRRAWADY RIVER, MYANMAR
Contract awarded for the supply of Led Marine Lanterns as well as Monitoring and tracking system for buoys on the Irrawaddy River Myanmar.
2018
DWIR, MYANMAR
Contract awarded from Directorate of Water Integrated Resources (DWIR) Myanmar for the supply and installation of Buoys along the Irrawaddy River from Yangon to Mandalay.
2018
DWIR, MYANMAR
Contract awarded from Directorate of Water Integrated Resources (DWIR) Myanmar for the supply and installation of Buoys along the Irrawaddy River from Yangon to Mandalay.
2014
SZCZECIN / SWINOUJSCIE, POLAND
Contract awarded from ProNow for Maritime Office Poland for the delivery of PE Spar Buoys and PE Modular Buoys.
2014
SZCZECIN / SWINOUJSCIE, POLAND
Contract awarded from ProNow for Maritime Office Poland for the delivery of PE Spar Buoys and PE Modular Buoys.
2012
PORT OF ROTTERDAM, NETHERLANDS
New contract awarded from Port Of Rotterdam for the design, and supply of 30 new 3.6mtr Diameter PE Mooring Buoys with SWL 108T.
2012
PORT OF ROTTERDAM, NETHERLANDS
New contract awarded from Port Of Rotterdam for the design, and supply of 30 new 3.6mtr Diameter PE Mooring Buoys with SWL 108T.
2008
MEKONG RIVER, CAMBODJA
Supply and installation of Modular PE Floating Dock for Ferry passenger embankment along the Mekong River.
2008
MEKONG RIVER, CAMBODJA
Supply and installation of Modular PE Floating Dock for Ferry passenger embankment along the Mekong River.
2007
MEKONG RIVER, CAMBODJA
Supply of the first PE modular Atons on the Mekong River Cambodia, Laos and Vietnam Project awarded by Mekong River Commission (MRC) over 4000 Km of Mekong River has been installed with PE Modular Low maintenance buoys.
2007
MEKONG RIVER, CAMBODJA
Supply of the first PE modular Atons on the Mekong River Cambodia, Laos and Vietnam Project awarded by Mekong River Commission (MRC) over 4000 Km of Mekong River has been installed with PE Modular Low maintenance buoys.
2006
PAPENDRECHT, NETHERLANDS
Supply of data buoys for dredging survey project Boskalis
2006
PAPENDRECHT, NETHERLANDS
Supply of data buoys for dredging survey project Boskalis
2004
HOBOKEN, BELGIUM
Supply of Mooring system (AMR 9000 90T SWL PE Mooring) including all Mooring lines with 16Ton Anchor) Project NorCargo/Stattoil Norway Loading operation of Gas Connectors modules in Hoboken Belgium to Heavy Lift Vessel
2004
HOBOKEN, BELGIUM
Supply of Mooring system (AMR 9000 90T SWL PE Mooring) including all Mooring lines with 16Ton Anchor) Project NorCargo/Stattoil Norway Loading operation of Gas Connectors modules in Hoboken Belgium to Heavy Lift Vessel
2003
KOBLENZ, GERMANY
Supply of Modular PE buoys as well as PE Trackless Buoys for the River Rhein Germany Contact awarded by Wasser und Shiffahrtsverwaltung des Bundes Koblenz Germany
2003
KOBLENZ, GERMANY
Supply of Modular PE buoys as well as PE Trackless Buoys for the River Rhein Germany Contact awarded by Wasser und Shiffahrtsverwaltung des Bundes Koblenz Germany
2002
BREMERHAVEN, GERMANY
Supply of Modular PE Buoys Jet 5000 and Jet 7000 to Wasser und Shiffahrtsamt Bremerhaven Germany
2002
BREMERHAVEN, GERMANY
Supply of Modular PE Buoys Jet 5000 and Jet 7000 to Wasser und Shiffahrtsamt Bremerhaven Germany
2001
PORT OF ROTTERDAM, NETHERLANDS
Awarded supply contract to replace all Steel Mooring Buoys in the Port of Rotterdam with Modular PE Mooring Buoys SWL 90T. Tempest has supplied over 60 Large Mooring Buoys over the years to POR
2001
PORT OF ROTTERDAM, NETHERLANDS
Awarded supply contract to replace all Steel Mooring Buoys in the Port of Rotterdam with Modular PE Mooring Buoys SWL 90T. Tempest has supplied over 60 Large Mooring Buoys over the years to POR
1996
RIVER SCHELT, ANTWERP
Awarded Contract for the supply of the first Modular Low maintenance PE Buoys to be installed on the River Scheldt (Tempest has supplied over 150 x PE Modular Buoys ever since for the River Scheldt)
1996
RIVER SCHELT, ANTWERP
Awarded Contract for the supply of the first Modular Low maintenance PE Buoys to be installed on the River Scheldt (Tempest has supplied over 150 x PE Modular Buoys ever since for the River Schelt)
A SELECTION OF SOME OF THE
KEY PROJECTS WE HAVE DELIVERED:
A SELECTION OF SOME OF THE KEY PROJECTS WE HAVE DELIVERED
1996
CREATION OF TEMPEST BVBA
1996
CREATION OF TEMPEST BVBA
Long lifespan and low maintenance
25+ years experience delivering bespoke projects
Innovative modular floating solutions
All equipment manufactured under ISO9002
ATONs according to IALA specifications
Long lifespan and low maintenance
25+ years experience delivering bespoke projects
Innovative modular floating solutions
All equipment manufactured under ISO9002
ATONs according to IALA specifications
Long lifespan and low maintenance
25+ years experience delivering bespoke projects
Innovative modular floating solutions
All equipment manufactured under ISO9002
ATONs according to IALA specifications
All rights reserved